Emerging Issues and Challenges in Integrating High Levels of Solar into the Electrical Generation and Transmission System
This report examines several aspects of how the bulk power system (consisting of traditional generators and the high-voltage transmission network) may need to evolve to accommodate the increased PV penetration resulting from achievement of the SunShot cost targets.
Categories: Report -

Distributed Solar Interconnection Challenges and Best Practices
While the actual cost metrics for utility PII are undetermined, they are real. A survey and interviews conducted by Solar Electric Power Association (SEPA) in 2014 have uncovered utility initiatives to lower the administrative costs of DG interconnection, making the process of connecting to the grid simpler and more transparent for customers.
Categories: Report